ITI’s long-running relationship with NBCUniversal covers conferencing, screening rooms and public-facing spaces for people who make and review media. The work reaches from the CEO’s boardroom at 30 Rockefeller Center to huddle rooms and meeting spaces for film executives in Los Angeles, with projects at stations across the country.
The brief
NBCUniversal needed one integrator able to work across that range of rooms within an established in-house engineering organization. Video calls carry content that participants have created and need to review, making image quality a central requirement.

Microsoft Teams Rooms for content review and collaboration
Logitech Rally and Crestron Flex systems underpin the Microsoft Teams Rooms program, which ITI has delivered across more than 80 projects since 2020. ITI coordinates this work with the engineers responsible for NBC’s facilities.
Executive screening rooms
ITI’s scope also includes executive screening rooms. Surround sound and picture quality have to satisfy people who watch and listen for a living.
LG direct view LED at 30 Rock and the Innovation Lab
An LG MAGNIT wall at 0.93 mm serves the Innovation Lab, and a 163-inch LG LAPA wall is installed at 30 Rock. The display program also includes commercial flat panels and LCD video walls.
AV-over-IP with Crestron DM NVX and Q-SYS NV
Crestron DM NVX video distribution was followed by Q-SYS NV installations as the work continued. These networked systems carry video between sources and displays, with Q-SYS also providing room audio processing and control. The project footprint includes 30 Rockefeller Center and 1221 Avenue of the Americas, NBC Sports in Stamford, the Telemundo Center in Miami and Universal Studios in Los Angeles.
The result
NBC teams can review content over video calls using systems refined with their engineers. The organization has one integrator across its meeting and screening spaces, working to its in-house standards. ITI continues its support and engineering work and, since the January 2026 spin-off, also supports Versant, home of CNBC, MS NOW, USA Network and Golf Channel.
- Location
- New York, Stamford, Miami, Los Angeles and stations nationwide
- Sector
- Media and entertainment
- ITI scope
- Conferencing, screening rooms, displays, integration, support and engineering
- Systems
- Microsoft Teams Rooms, direct view LED, AV-over-IP, surround sound, room scheduling
Systems installed
- Microsoft Teams room systems
- Since 2020, more than 80 projects: 169 Logitech Tap room-system bundles and 157 Crestron Flex systems supplied, including UC-CX100-T, UC-MX70-T, UC-BX30-T, UC-MMX30-T and related kits.
- Logitech conferencing audio and video
- 79 Rally Bar and 111 Rally Bar Mini video bars, with 149 Rally Mic Pods, supplied across the program.
- Shure room audio
- 36 IntelliMix P300 audio processors, 12 MXA310 table arrays and 11 MXA910, MXA920 and MXA925 ceiling arrays supplied.
- Room scheduling
- 409 Logitech Tap Scheduler panels and 23 Neat Pads supplied.
- Collaboration and room cameras
- 12 Neat Boards, 11 Microsoft Surface Hub 2S units, 25 Huddly L1 cameras and 11 Logitech Scribe whiteboard cameras supplied.
- LG commercial displays
- Display work since 2020 covers more than 1,500 flat panels overall, including 403 LG UH5, UH7 and UP5 series displays from 43 to 98 inches on 68 projects.
- Samsung commercial displays
- 298 BE-T and BE-C series displays, 136 QM, QB and QH series displays, and 597 TU7000 displays in 55-inch and 43-inch sizes. Of the TU7000 displays, 509 were part of a single 2022 communication-display program.
- AV-over-IP video distribution
- 136 Crestron DM NVX 4K60 4:4:4 encoder and decoder endpoints installed in 2022 and 2023, followed by 166 Q-SYS NV-series video endpoints installed in 2025 and 2026.
- Q-SYS audio and control
- 30 Q-SYS Core processors, 82 Q-SYS AcousticDesign ceiling loudspeakers and 20 Q-SYS TSC-G3 touch controllers supplied since 2022.
- Point-to-point video
- 363 Crestron DM Lite HDMI-over-category extenders supplied.
- LG MAGNIT direct view LED
- 36-cabinet LG MAGNIT 0.93 mm wall with an LG CEAA 8K controller installed in the Innovation Lab in 2026.
- LG LAPA direct view LED
- 163-inch LG LAPA 1.8 mm all-in-one wall installed at 30 Rock in 2025.
- Samsung LCD video walls
- 31 Samsung VH55T-E 55-inch tiles installed and 10 Samsung VM55B-U tiles supplied in 2021 and 2022.
